Case Study

Open de España Golf Tournament Case Study

Open de España Golf Tournament Case Study

Pages 2 Pages

Open de España Golf Tournament Case Study In 2010 for the second year GL events UK supplied approximately 3,000sqm of temporary structures to the 2010 Open de España golf tournament. A brand new Absolute double deck was debuted at the tournament which was used for the VIP hospitality suite, located behind the 18th green and featured an Eclipse curved roof profile and inset balcony.GL events UK Station Road Castle Donington DE74 2NL T : 01332 850 000 Second Drove Fengate, Peterborough PE1 5XA T : 01773 344 110 The press centre was made from a single-story Absolute structure with a round Atrium end. Various other event structures from our Ultimate and Absolute ranges were located around the course and used for offices, retail outlets, bars and restaurants. Open de España Golf To

Join for free to read