Case Study
Online THM Analyzer Helps Utility Optimize Operation and Validate Laboratory Results
Online THM Analyzer Helps Utility Optimize Operation and Validate Laboratory Results Background The BTWD operates three facilities, including Jackson Station, a 3.5 mgd intermittently regenerated greensand treatment facility to meet the needs of approximately 30,000 residents in the towns of Brunswick and Topsham. In addition to the Jackson facility BTWD also operates the Taylor Station (2.5 mgd) and Jordan Station (1.5 mgd).