Case Study

ON Semiconductor

ON Semiconductor

Pages 1 Pages

When ON Semiconductor wanted to upgrade the fire protection system at its Senawang plant in Malaysia, they required a quick and reliable solution that could be installed while 24-hour plant operation continued. The owner required installation and testing of the deluge sprinkler system that would protect the plant’s cooling towers while minimizing downtime to the HVAC system. To meet these requirements, Victaulic FireLock ® couplings, fitt

Join for free to read