Case Study

Olympic Village Rafts

Olympic Village Rafts

Case Study : 2012 Olympics Athletes Village – SUDS Rafts Client: ODA Contractor: VolkerFitzpatrick AquaticEngineering secured the fabrication and installation of 3 floating remediation raft systems at the Athletes Village in the 2012 Olympic Park. The contract was won on the basis of innovative design and value for money. AquaticEngineering had worked on the design of the raft with ODA consultants and desi

Join for free to read