Case Study

Olympic Stadium Receives Delicate Ground Protection

Olympic Stadium Receives Delicate Ground Protection

Pages 3 Pages

Olympic Stadium Receives Delicate Ground Protection Failure was not an option for LION when contractors discovered that Olympians wouldn't be the only traffic running on their brand new athletics surface. Customer Name LOCOG Project Location London Products Used Lion PanelLOCOG’s tight timescales created the most challenging of demands during the Olympic village construction and LION’s mettle was put to the test when it transpired that two, 200 ton cranes would have to travel around the brand new surface to lift equipment up to the roof of the stadium. Because of the Games' immovable deadline, the risk of the slightest damage would be catastrophic, so LION’s expertise was called upon to provide ground protection and ensure the delicate surface was carefully protected. A special composition