Olympic City Power Substation

Olympic City Power Substation

Pages 4 Pages

Olympic City Power Substation Rio de Janeiro, Brazil The challenge The responsible power company needed a proven and reliable monitoring solution that could be implemented on time as well as easily integrated into the pa r k ’ s existing SCADA system and IT structures. AP Sensing was selected because of meeting IEC-61850 standards, DNP3 capabilities, and because of our track record for reliability, flexibility and superior support services. Power for the new facilities comes from two new circuits: the 12 km Gardenia and the 2 km Barra substations. One AP Sensing Linear Power Series device with 6 channels – 3 for each substation – was installed with a single-ended configuration. The longer circuit brought its own specific challenges, as it is routed through diverse soil types and travels b