Case Study
Olero Creek Restoration Project - Refurbishment Of The North Water Station
INTRODUCTION In October 2010 Chevron Nigeria Limited (CNL) awarded the Olero Creek Restoration (OCR) contract to Saipem Contracting Nigeria Limited (SCNL) with Nigerian Westminster Dredging and Marine Limited (NWDM) as subcontractor. The Olero Creek facilities are located in the Olero Creek Field in OML-49 lease and consist of: The North Flow Station (NFS), including production separation and oil shipping The North Water Station (NWS), including water treating and injection The North Compression Station (NCS), including gas compression and dehydration Quarters and Utilities Station (QUS), including accommodation, power generation and utilities These four gravity-based concrete barges are connected by Interconnecting Piping (ICP) along a bridge. The North