Case Study

Office Building Upgrades Filtration

Office Building Upgrades Filtration

THE WORLD LEADER IN CLEAN AIR SOLUTIONS CASE STUDY – COMMERCIAL Current Filtration Situation Cushman & Wakefield of Texas has been a loyal AAF International customer for many years. When Cushman & Wakefield began investigating ways to improve its building efficiency at 777 Main Street in 2009, AAF was there to assist with proven filtration solution options. The building at this time utilized MERV 8 PerfectPleat ® Ultra filters. In order to obtain a Leadership in Energy and Environmental Design (LEED ® ) certification for the building, the plaza would need to upgarde its filtration in order to reach this goal. Sustainable Filtration Rising energy costs and the current economic downturn are increasing the pressure on commercial buildings to cut energy costs and create mor

Join for free to read