Oakville, Ontario, Go Transit Parking Structure Design/ Build

Oakville, Ontario, Go Transit Parking Structure Design/ Build

Pages 2 Pages

OAKVILLE, ONTARIO, GO TRANSIT PARKING STRUCTURE DESIGN/ BUILD CASE STUDY Pre-Con was proud to be chosen for the Oakville GO Transit Design/ Build Parking Structure project. The building boasts 6 suspended levels; 1394 stalls including slab on grade and a precast roof. Choosing precast concrete instead of CIP allowed the GC to perform more tasks at one time on the site and the precast components were manufactured off site resulting in fast efficient construction. Precast concrete columns, shearwalls and the TT’s were selected for quality control, the elements manufactured off site in a controlled environment; Higher Architectural Specifications – ‘Consultations with Town Officials and residents to ensure façade blended into surrounding neighborhood’; Precast erection schedule h