Case Study

O2 Saturated Water Injection (SWI)-Former Aluminium Works

O2 Saturated Water Injection (SWI)-Former Aluminium Works

Pages 1 Pages

July 2012 O 2 Saturated Water Injection (SWI) - Former Aluminium Works SITE: Former Aluminium Works, Newport, Gwent CLIENT: Tamdown Regeneration/Confidential CONTRACT: £300K ICE Design and Construct contact to carry out remediation of hydrocarbon impacted groundwater. CHALLENGE: The previously demolished works required treatment of two separate plume areas, Area A - East Works and Area B – Effluent Plant. The estimated

Join for free to read