Case Study
Road Resurfacing With an SMA Thin Layer In Winter
Requirements The aim of the contract was to protect with a thin layer the structure of the road and to improve the existing surface, both in terms of grip and of repairing minor damage to the surface. The project was also used to demonstrate the capability of thin surfacing layer to reduce noise by 4dB(A) or more. Applying thin surface layers in winter requires special measures to be taken. Using a hot mix, there can be a problem with compact