Case Study

Two-Way Street Which Forms Part of the Poznan North-South Transport Route

Two-Way Street Which Forms Part of the Poznan North-South Transport Route

Pages 2 Pages

Requirements The flow of traffic in a congested areas of Poznan with very slow moving heavy trucks needed to be improved. Solution Reconditioning a 500 metre stretch of two way carriageway between ul. sw. Wawrzynca and ul. Jana Henryka Dabrowskiego was seen to be the way to alleviate the problem. This required a special asphalt mix and a high performance bitumen to cope with the traffic that consisted mainly of heavy vehicles. Nynas’ Extra gr

Join for free to read