Case Study
Major Reconstruction of Carriageway
Requirements The E47/E2 forms part of Denmarks ‘Big H’ motorway network. A seven kilometre section of the ‘Sydmotorvejen’ route’s southbound carriageway had fallen into disrepair, becoming cracked and uneven. Major reconstruction of the concrete pavement was required. Solution The road was refurbished and paved with asphalt. Refurbishment of the road involved removing a 200mm thick layer of concrete,. carrying out cement stabilisation to la