Case Study
NOVEC 1230 and TYCO
Pear Tree Lane, Dudley, West Midlands DY2 0QY tel 01384 573350 email sales@brylandfire.com www.brylandfire.com Following a very successful install in their on-site server room (see the other Case Study), GE took the decision to protect their latest asset – two Diesel Generators - that have been very recently installed at the site. As with the previous install, it was entrusted to Bryland Fire. The two brand new generators are enclosed in an