Case Study

Northumbrian Water

Northumbrian Water

Pages 1 Pages

NORTHUMBRIAN WATER Location: Spectrum Business Park, Seaham Contract Period: 10 Weeks Service: We incorporated flexible and folding walls into the design along with new power and data, air conditioning and ventilation installations and a brand-new communications room. Various meeting spaces, reference areas, touch down zones and quiet pods. The installation consisted of a variety of furniture solutions, from desking, task chairs, screens and monitor arms to soft seating, private booths and lockers. The large canteen area serves as both a breakout area, but also a place for informal meetings. The acoustic rafts add to the aesthetics of the canteen area, but also minimise the noise pollution to ensure it is a comfortable space for all. “Ultimate not only met our brief but exceede

Join for free to read