Northland Resources Improves Efficiency And Optimises Project Economics With Gemcom Solution
“We deferred a bulk sampling expenditure of $500,000 to $1 million by applying drillhole data and conducting statistical analysis using the Surpac database. We obtained much of the same information as if we had completed a bulk sample, so there was no immediate need to excavate, build a dike or obtain environmental permits.” — Matt Blattman, Senior Manager of Engineering, Northland Resources Inc. Portal of the bulk sample drift at Stora S