Case Study

Northern Exposure at Duluth International

Northern Exposure at Duluth International

Pages 4 Pages

Passenger Terminal aT DUlUTH inTernaTional airPorT Duluth International Airport’s new $78 million passenger terminal is a 101,000 sq. ft. LEED Silver certi? ed facility with a unique design vision that re? ects the natural beauty of Northern Minnesota. The building, designed by Reynolds, Smith, and Hills, Inc. (RS&H) in collaboration with TKDA, took four years to complete and was erected in front of the old terminal, which no longer met fe

Join for free to read