Case Study
Northampton College
The Brief: The Brief: Predominantly required daylight linking in lecture theatres, and occupancy control throughout building. Our Insight: Our Insight: New build college and education facilities. Our Solution: Our Solution: RAPID was used throughout. The Result: The Result: This 22,000 square metre building opened for in April 2011 and provides the latest sustainable, energy e cient technology and facilities including biomass boilers and a helical wind turbine. Northampton College, Booth Lane Northampton College, Booth Lane This 22,000 square metre building opened for in April 2011 and provides the latest sustainable, energy e cient technology and facilities including biomass boilers and a helical wind turbine. Predominantly required daylight linking in lecture theatres, and occupancy cont