Case Study
North Burleigh Plant Expansion
NORTH BURlEIGH plANT EXpANSION BISMARCK, NORTH DAKOTA, UNITED STATES 4o 38 39 NORTH BURLEIGH PLANT EXPANSION BISMARCK, NORTH DAKOTA, UNITED STATES - HigHligHts - UF SyStem Flow rate: 13,630 m 3 /d (2,500 gpm) Recovery rate: 95 % the flow rate of the UF system was increased by 8,180 m 3 /d (1,500 gpm). RO SyStem Flow rate: 8,180 m 3 /d (1,500 gpm) Recovery rate: 80% the flow rate of the RO system was increased by 5,450 m 3 /d (1,000 gpm). Add