Case Study

Noise from 400 MW Power Station

Noise from 400 MW Power Station

Pages 1 Pages

The Airshed Ltd 5 Lauder Place, East Linton EH40 3DB. Tel; 01620 860 529 Fax 0870 762 0018 email mail@theairshed.com The Airshed Case Study No 28 Noise from 400 MW Power Station A detailed acoustic study was required for a proposed 400MW combined cycle gas fired turbine power station near Cork in the south of Ireland. The plant permit condition issued by the Irish Environmental Protection Agency specified noise limits at the neare

Join for free to read