Case Study

NMDOT Route 4

NMDOT Route 4

Bridge Replacement / Stream Crossing Owner: New Mexico Department of Transportation Engineer: New Mexico Department of Transportation Contractor: Interstate Highway Contractors Technical Description: • Product: BridgeCor ® • Span: 32-ft. • Rise: 9-ft. 8-in. • Length: 64 ft. Installation: January 2015 The New Mexico Department of Transportation (NMDOT) needed to replace a 74 year old timber bridge on rural Route

Join for free to read