Case Study
NHS Hospital
CHALLENGES FACED 1. The client reported major speed controlling issues with the original factory-fitted Woodward digital governor system. This left the hospital relying on a rented genset for 18 months for emergency standby power. 2. When IPU’s Engine Control engineers arrived on-site it was discovered the engine was one of the biggest built by Perkins: the 4016 TAG4. This turbo-charged V16, 61 litre engine uses common rail injection. It