Case Study
Newland Road (SR-1126)
CASESTUDY REINFORCED ASPHALT OVERLAY GG19 lying area with poor quality soils. At the time, a canal nearly 17 feet deep was excavated along Newland Road’s southern border to provide adequate drainage. With poor native soil conditions and years of trucking traffic, portions of the segment had continuously failed. Conditions were so poor that road rehabilitation (repairs and repaving) was taking place every two years. Alternative Solutions: “The roa