New Court luxury retirement apartments - A smoke control system was installed across the building which consisted of 8 zones and 17 window actuators.

New Court luxury retirement apartments - A smoke control system was installed across the building which consisted of 8 zones and 17 window actuators.

Pages 4 Pages

Manual & Electric Window Control Systems NEW COURT CHELTENHAM Case StudyNEW COURT Cheltenham New Court is a new development in Cheltenham consisting of luxury retirement apartments. A smoke control system was installed across the building which consisted of 8 zones and 17 window actuators. Aesthetics were important as part of the luxury feel of the building so WMU836 actuators were selected due to the slim profile design and silver anodised finish. The work was completed by building contractor Stepnell Ltd. THE DRAWINGS & IMAGES IN THIS DOCUMENT MUST NOT BE COPIED, OR PLACED AT THE DISPOSAL OF A THIRD PARTY IN WHOLE OR IN PART WITHOUT WRITTEN PERMISSION FROM TEAL PRODUCTS LIMITED. Case StudyPRODUCTS: WMU 836 Chain Actuator VCS-S1 AOV Control Unit BG2/FOS/O Override SwitchTeal Produc

Join for free to read