Case Study
New Cable Assembly For The Food And Beverage Market
Customer Problem: A revo machine at a protein processing plant was used a lot and was plugged and unplugged repeatedly. Heavy equipment was being rolled over the electrical cord/plug assembly. Plus, the cable was being used to pull the plug out of the electrical socket causing damage to the conductors and connection. t PC solution: TPC designed a new assembly with upgraded cable that has required no maintenance since installation and the wri