Case Study

New Baden, IL

New Baden, IL

New Baden, IL entexinc.com/installations/new-baden-il/ A tertiary disc ?lter was installed and started up in 2011 at the Village of New Baden WWTP in IL. The wastewater facility improvements include a new moving bed bio?lm reactor, FlowTex cloth disc ?lter and ultra violet disinfection system. The FlowTex ?lter has a design ?ow of 78,000 gallons per day average ?ow and 2.9 million gallons per day peak ?ow. The six 84 (model D84x6) disc ?lter was

Join for free to read