Case Study

Nawaplastic

Nawaplastic

Pages 2 Pages

World Leaders in Sustainable Change © Renoir Consulting Limited. This document remains the property of Renoir Consulting Limited and must not be copied or distributed in hardcopy or electronic form without the prior written approval of Renoir Consulting Limited. Key Results Reduction in non-budgeted Payroll costs; reduction in Operations Overtime of 15% Reduction of incurred fines of 30% Increased maintenance productivity by 32% Improved a

Join for free to read