Case Study

Natural Gas Booster

Natural Gas Booster

The Challenge An existing Ariel JGH/2 compressor Operator in Pennsylvania had an op- erational problem in a gas turbine booster application. The compressor system was designed to feed compressed natural gas into a turbine at a constant discharge pres- sure. The actual gas flow in the application is based on the requirements of the tur- bine which is dictated by the power de- mand on the system. The existing suction scrubber was