Case Study

Muscat Airport Control Tower

Muscat Airport Control Tower

Pages 1 Pages

Bringing structures to life Case Study Muscat Airport Control Tower Client: OAMC Contractor: Carilion Awali Location: Muscat, Oman Products: Tru-Lift Carillion Alawi has utilised the RMD Kwikform self-climbing wall formwork system, Tru-lift, on the 100-metre tall Air Traffic Control Tower at the new Muscat International Airport in Oman. Construction on the new 12-million capacity airport is expected to be completed by 2014, with three subs

Join for free to read