Case Study
Murrumbidgee Irrigation
Project: Murrumbidgee Irrigation Channels Date: 1996 Client: Murrumbidgee Irrigation Location: NSW ELCOSEAL ® During the winter months while irrigation channels lie dormant, areas with seepage problems are usually rehabilitated as a part of regular bank renewal. Reworking or replacing existing banks is expensive and time consuming. A simple method of repairing leaking channel banks