Case Study

Municipality Improves Drinking Water Distribution Reliability and Throughput with Dependable Pressure Measurement

Municipality Improves Drinking Water Distribution Reliability and Throughput with Dependable Pressure Measurement

Pages 2 Pages

© 2009 Rosemount Inc. All rights reserved For more information: www.rosemount.com WATER DISTRIBUTION Municipality Improves Drinking Water Distribution Reliability and Throughput with Dependable Pressure Measurement ROSEMOUNT 3051S Rosemount 3051S The 10-year stability and 12-year limited warranty of the Rosemount 3051S provided the necessary reliability this municipality needed for its remote monitoring applications. RESULTS • Improved water distribution reliability • Increased water throughput • Decreased operations and maintenance costs APPLICATION Water Distribution Pressure CUSTOMER Municipality in Australia CHALLENGE This municipality was experiencing leakage and ruptures from their aging water distribution lines that carried drinking water to its end users. The water loss

Join for free to read