Case Study
Municipal Sewage Bahrain
HYBACS ® www.bluewaterbio.com Municipal Sewage: T ubli, Bahrain Background The existing activated sludge plant at Tubli Water Pollution Control Centre (WPCC) was designed to treat a daily flow rate of 200,000m³/d. However, due to the continuing rapid growth of Bahrain, the flow rate into the works was in excess of 300,000m³/d and this is only expected to increase in the future. Because the works were overloaded, the treated effluent was frequ