Municipal flood control

Pages 3 Pages

Municipal flood control "We were missing everything! Koege lacked all the equipment to handle a situation like this, so we had no control at all, " Michael Munk explains, he is the Project Consultant at ETK, and has the main responsibility for municipal preparedness and tactical leadership. "We just barely manage the situation, because we collaborated with others," he says, adding that in a flood disaster situation like this his municipality is just one coastal municipality out of many, and suddenly everyone needs help at the same time, so there was not enough capacity to help everyone. After this disaster, ETK called Elmodan and got their own equipment. Grindex is the top of the doll Sometimes it takes a disaster before action can be taken. ETK was given an extra license to buy their own