Case Study

Multidisciplinary services for major regeneration at Kirkstall Forge

Multidisciplinary services for major regeneration at Kirkstall Forge

Pages 5 Pages

Multidisciplinary services for major regeneration at Kirkstall Forge For this major regeneration scheme northwest of Leeds city centre we are providing multidisciplinary engineering and infrastructure services to transform a contaminated 25-hectare brownfield site into a diverse and sustainable mixed-use community. Our full scope of work covers the infrastructure design, including a new highway and bridge linking to the new railway station; geotechnical design, including the road embankment and specification of a reinforced soil wall; earthworks design and specification; ground and groundwater contamination remediation design and specification; and the design of utilities associated with the highway and initial phases of redevelopment. BackgroundFirst established by Cistercian monks, in th

Join for free to read