Mulroy Bridge, Donegal

Mulroy Bridge, Donegal

Project: Mulroy Bridge Donegal Main Contractor: Ascon Engineer: RPS Concrete Supplier: Muckish Sand & Gravel Products used: Chemcrete 100 Plus Chemcrete CR800 The bridge replaces an old ferry that plied the bay to connect two communities up to mid 1960s. Prior to the construction of the bridge, the journey time between the Fanad Peninsula and the Rosguill Peninsula was up to 2 hours (50km) – it now takes 5 to 10 mi