Case Study

“MTBF increase from 4 months to over 8 years”

“MTBF increase from 4 months to over 8 years”

Pages 1 Pages

www.aesseal.com AESSEAL ® upgrade solution leads to an 8 year failure free period An Italian metal processing plant was using gland packing to seal their mineral slurry transfer pump. This sealing was failing roughly every 4 months and causing a yearly replacement of the shaft sleeve. AESSEAL ® installed a cartridge double seal (CDSA) and PUMPPAC™ forced lubrication support system. The PUMPPAC™ system was chosen because after investigati