Case Study

MPC enables BP to cement 22” surface casing and isolate notorious sands

MPC enables BP to cement 22” surface casing and isolate notorious sands

MPC Case Study 1 BP , Caspian Sea THE CHALLENGE: CEMENTING TOP-HOLE SECTIONS IN A NARROW PRESSURE WINDOW The cementing of top-hole sections in narrow pressure windows has traditional- ly been highly problematic. This has been due to cement slurry loss, plus shallow water and gas flow. Safety and environmental best practices dictate drilling and cementing the top-hole wellbore with full control over the returns from fixed offshore plat

Join for free to read