Case Study

Mourne Conduit

Mourne Conduit

Mourne Conduit Design and Build Contract to replace the existing 35km of the Mourne Conduit from Spelga Dam to Belfast with welded steel pipes 1200mm and 900mm diameter in roads, verges and fields. CLIENT: NORTHERN IRELAND WATER VALUE: £26.5 million CONTRACT PERIOD: 15 MONTHS Summary Also included in the contract was a 6 bay pumping station with140ml/day through a 60m head, re-valvingand refurbishment of existing service reservoirs,

Join for free to read