Case Study

Morelos Del Sol Project

Morelos Del Sol Project

Pages 1 Pages

Developer EPC Location Avg. Temperatures Completed System Size Panel Type Number Panels Expected Annual Energy Generation CO2 Reduction Inverter Mounting Monitoring Solar Frontier Americas Development LLC DEPCOM Power Lost Hills, California 17.8°C / 64°F November 2015 18.7 MW (15 MW ac) Solar Frontier CIS SF165-L, SF170-S 111,744 40,215 MWh 30,161 Tons Annually Bonfiglioli RPS TL – 1350 Clavijo Single-Axis Tracker

Join for free to read