Case Study
MORE and Pump Optimization Real-Time Value
MORE HOC and Pump Optimization Case Study # 22 180 160 140 120 100 80 60 40 0 2 4 6 8 10 12 14 180 10 9 8 7 6 5 4 11 RPM Wear ((%)%1) Eff.(%) Effect of Pump Speed on Operating Costs Power(kW) Maximum Performance Pump Speed Power Consumption Efficiency Peak Wear Rate Day # BHP Real-Time Value • $15,000 savings to customer in the first 4 months. • Additional savings through extended pumplife, reduced work- overs, and reduced lost production