Moorvale Coal Project

Moorvale Coal Project

Pages 1 Pages

Create Build Operate The design enabled a subsequent economical expansion for the preparation plant module to 600 t/h and a product stockpile expansion for an additional product. For this project Sedgman developed a tunnel construction method that reduced tunnel height and saved on earthworks and construction man hours. To reduce overall project costs, the dump hopper was also built into the ground. The compact plant occupies a small footpri