Case Study

Mooring Analysis for an 80m LOA Vessel

Mooring Analysis for an 80m LOA Vessel

Pages 1 Pages

Mooring Analysis for an 80m LOA Vessel Summary Client: Technics Oil & Gas Ltd. Country: Singapore Project Location: Loyang Offshore Supply Base What We Delivered BMT was appointed by Technics Oil & Gas to conduct a mooring analysis for an 80m LOA vessel and advise on the maximum ship size which can berth at the wharf at Loyang Offshore Supply Base, Singapore Outcome and Benefits Scope of work for the mooring analysis was as follows: 1. Analyze the vessel berthing and mooring at the berth using the existing and new proposed bollards; 2. Checking the available water depth and tide in the region; 3. Suggesting some additional fenders after site inspection; 4. Analyze alternative mooring arrangements and suggesting the best possible arrangement; 5. Assess vessel arrival and departure condition

Join for free to read