Case Study
Mooney Mooney Ck Bridge, NSW
Strength. Performance. Passion. Mooney Mooney Ck Bridge, NSW Precast arches, spandrel and wing walls Case studyUnusually high levels of rainfall during 2011 helped identify structural instability with a corrugated metal pipe (CMP) drain in the Peats Ridge area. Gosford City Council decided to replace the ageing stormwater drain, so it looked for a durable solution that could be installed quickly to minimise road closures. The ageing drain was