Case Study

Montague

Montague

Pages 1 Pages

358 Chestnut Hill Ave, #204B Boston, MA 02135 Office: 617.505.5095 www.CleanWaterOps.com COST SAVINGS, NITROGEN & PHOSPHORUS REMOVAL MONTAGUE, MASSACHUSETTS (POPULATION 8,500) A collaborative effort has resulted in the development of the Sequenced Aeration process, a highly effective method of nitrogen and phosphorus removal. Cost: $100,000 Annual Operating Savings: $500,000/yr in reduced sludge disposal costs Case Study: Montague Montag

Join for free to read