Case Study
Monster Makeover
Monster Makeover Residencial | Case Study In 2011, Elytronic was commissioned to deliver an elaborate automation project for a family home in Cyprus. The planning stage alone took almost two years, with multiple revisions until the end of 2013; such was the scope of the project. The size of the house is generous, over 2000m2, and was to include over 25 unconnected systems, that needed integrating to make this family home work seamlessly. With the design finalised, the project was delivered in 2015. “Our aim was to make the automation as easy and user friendly as possible,” comments Harris Epaminondas, Managing Director at Elytronic. “With such a large property you can get left with a lot of control panels and wiring which we tried to eliminate throughout the project. This way,