Case Study

Monitoring of Heat Balance and Performance Calculation with CENTUM CS 3000

Monitoring of Heat Balance and Performance Calculation with CENTUM CS 3000

Pages 3 Pages

Location: Order date: Completion: Industry: http://www.yokogawa.com/suc/ SUCCESS STORY Rayong, Thailand 2006 2008 Power Executive Summary PTT Utility Company Limited CUP2 (PTTUT CUP2) operates a combined cycle power plant in Rayong, Thailand that sells electricity (34 MW) and steam to a nearby aromatics plant belonging to PTT Global Chemical (PTT-GC). It also sells 45 MW to the national power utility, Electricity Generating Authority of Thail

Join for free to read