Case Study

MINJAR GOLD – SOUTHERN CROSS

MINJAR GOLD – SOUTHERN CROSS

For further information email info@mitchellservices.com.au or call +61 (0) 7 3722 7222 www.mitchellservices.com.au Client: Minjar Gold (Tianye) Service: Surface Drilling – Diamond and Reverse Circulation Location: Southern Cross, Western Australia Project Challenges: • Limited ramp up time • Ground conditions (waste dumps) • Terrain for drill pads • Controlled drilling/target windows • Hole variation • Hole angles Approach and Equipment Used: • 1 X Sandvik DE880HC • 1 X Support truck • 1 X Auxiliary compressor/booster truck • 4 X Mine Specified Toyota Landcruiser LV’s • Fuel and water pods • Containers with critical spares • Survey equipment Client Outcomes: • Zero Lost Time Injuries (LTI’s) • Zero re-drills and all targets hit • All drilling equipment recovered • Lowest cost per metre

Join for free to read