Case Study
Mining Bucket Maintenance
Case Study www.austineng.com.au PROBLEM Austin Engineering Group Member Pilbara Hire was tasked with minimising maintenance costs and downtime related to mining buckets on a Pilbara mine site. The bucket maintenance program was to incorporate back hoe buckets, face shovels, loader buckets and auxiliary equipment. SOLUTION Pilbara Hire developed a maintenance program involving all bucket inspections; repairs and maintenance, including ground