Case Study

Minimizing Turnaround Time and Production Loss with Gamma Scanning

Minimizing Turnaround Time and Production Loss with Gamma Scanning

Pages 2 Pages

When Performance Matters www.scanningtech.com © Copyright Scanning Technologies Inc. – All Rights Reserved Minimizing Turnaround Time and Production Loss with Gamma Scanning THE CHALLENGE Scheduled shutdowns are required at any operating plant. Pinpointing problem locations prior to a shutdown can reduce production loss by focusing on areas of concern. In this Case Study, our customer expected to open 6 of 10 towers for visual inspection, cleaning and repair in their scheduled shutdown. ScanTech was asked to perform Gamma Scanning to verify our customer’s existing shutdown plan and strategy, order necessary equipment and minimize lost production from a lengthy, extended turnaround. OUR RESPONSE Gamma Scanning was performed on all trayed and packed to