Case Study

MILLER CREEK PLANT

MILLER CREEK PLANT

Pages 1 Pages

MILLER In July 2002 the Miller Creek Plant in Burien, WA needed to replace deteriorating components in the headworks of the plant. This entailed the installation of new stainless step screens, the replacement of the grit collection system, the repair of the primary distribution box and the addition of air blower capacity to the system. Because the Miller Creek collection system is very long, the residence time of the wastewater in the pipes

Join for free to read